

Assess digital solutions for managing curbside and pick-up/drop-off spaces, with a focus on local operational needs, stakeholder requirements and enforcement conditions.
Prague focused the demonstration of this solution by testing the dynamic management of one curbside parking space using electronic signage and occupancy monitoring. The parking space changes function throughout the day (loading zone, no parking/stopping, residential parking) while monitoring occupancy in real time.
The effectiveness of the Dynamic Curbside Management Tool depends strongly on local parking regulations and enforcement.
Assess local parking regulations, enforcement mechanisms and operational constraints before implementation. Integrate these requirements and existing city pain points into the solution design from the beginning.
The alignment between solution-development and pilot timelines is critical. Delays in technology delivery can substantially reduce the time available for physical testing and evaluation.
Verify solution maturity before deployment and build sufficient flexibility into implementation timelines.
Cooperation between the city and developer is essential to ensure that the solution responds to actual city needs. Some city-specific requirements and pain points need to be incorporated earlier in the development process.
Establish a structured process for communicating city needs, pain points and operational requirements before and during technology development.
Main takeaways from implementation




Action-oriented advice for future adopters
Because physical deployment was not feasible, Prague carried out a simulated demonstration and stakeholder workshop presenting the booking system, parking reservation functions and management interface to logistics operators and city representatives.
Passenger vehicles often park illegally in loading zones. Without an enforcement mechanism, the pilot would not be effective. Prague requested that this issue be reflected in the solution, but it was not incorporated.
Integrate enforcement mechanisms into the solution and ensure local enforcement capacity exists.
Prague shifted from physical testing to a workshop. The platform was demonstrated to urban logistics operators, and surveys were used to collect their feedback.
Workshops and surveys are easily transferable and useful for collecting operator feedback before implementation.
The city's pain points were identified early, but the solution was not flexible enough to respond to these local needs. Prague highlighted that cities should first explain the problem and developers should then adapt the solution accordingly.
Developers should incorporate city pain points early so that the final solution reflects local operational needs.
Physical deployment was constrained by difficulties installing sensors in the existing infrastructure and identifying a suitable pilot location.
Assess the proposed site and installation requirements before deployment, including sensor installation methods, drilling restrictions, communications infrastructure and any physical modifications required.
Main takeaways from implementation




Action-oriented advice for future adopters

















